t: 01652 656813
e: info@bwshrimpton.co.uk

Humber University Technical College

Humber University Technical College, Scunthorpe
Contract value: £750k
Client: Clugston Construction

B W Shrimpton worked closely with Clugston Construction on this 12 month programme, our works were over a duration of 40 weeks involving 4000m2 sfs including Siniat weatherboard, recticel insulation and brick tie channels.

Internally Siniat produced a specification involving 70mm c stud with universal board used throughout the job to give the client the fire and dB ratings required, along with the high impact to all walls.

Owa ceilings were installed including db cosmos 600x600, grey 1800x300 cosmos planks to corridors and black sinfonia ceiling rafts formed out of main tee and trim.

B W Shrimpton also installed 4000m2 of flowing screed supplied by Cemex.

For more details on any of our projects or to make an enquiry about future work, please contact Kirk Shrimpton - tom@bwshrimpton.co.uk or call 01652 656813.

Humber University Technical College - Scunthorpe

Humber University Technical College - Scunthorpe

Humber University Technical College - Scunthorpe

Humber University Technical College - Scunthorpe